Quattro Constructors was contracted to conduct a trench excavation of up to 7 meters deep, as well as to install EPS foam blocks on top of an existing GVRD truck sewermain to accommodate future development on the site.
Quattro Constructors was contracted to conduct a trench excavation of up to 7 meters deep, as well as to install EPS foam blocks on top of an existing GVRD truck sewermain to accommodate future development on the site.